A leading aviation industry enterprise: two-week launch of a drawing process labor-hour quotation system
Chinese original · AI organized · Explicit FDE
Case Overview
Business Problem
Finding similar parts among approximately 20,000 drawings, process labor hours depend on veteran workers, and repeated quotations start from zero.
Publicly disclosed AI solutions
Chinese original · AI-organized. Tianfu Zhiyuan enters the site under the FDE staffing model, using 20,000 historical drawings to support new-part process, labor-hour prediction, and dual-option quotation; a deterministic engine adjudicates, and the business side progressively tests and accepts.
Core Engineering Findings
Engineering Analysis by This LibraryQuotation correctness must be broken into a traceable chain
Changes in version, material, and process can make visual similarity lose cost comparability.
Original disclosure · View basisTechnical Architecture
Public solution summaryThe original discloses 1 business expert, 1 AI technical expert, and several AI digital employees; real data is involved throughout, using a deterministic engine, dual options, and human-in-the-loop. Drawing parsing, retrieval, and ERP/PLM interfaces are not disclosed.
View the complete architecture and reference data flowKey engineering trade-offs
Engineering Analysis by This LibraryAI recall suggestions, rule-based recalculation, expert confirmation.
Maintenance is heavier but recalculable.
In-depth Technical AnalysisOutcomes and Verification Boundaries
Production deploymentVendor self-report: approximately 20,000 drawings; approximately two weeks from data receipt to deployment and launch; zero error in reproducing historical prices in the library.
Original text verified · Vendor disclosure · Customer not named
Customer anonymous; zero error in historical prices in the library does not equal accuracy on new parts, profit margin, or production benefits. Sample splitting, versions, and independent acceptance are not disclosed.
Complete results criteria and applicable boundariesIn-depth Technical Analysis Architecture, Trade-offs, and Transfer Conditions
Business Background and Process
Research AnalysisFinding similar parts among approximately 20,000 drawings, process labor hours depend on veteran workers, and repeated quotations start from zero.
- Role
- Role-specific business experts, AI technical experts, process and quotation personnel, AI digital employees, and approvers.
- Reproduction scope
- Only reproduce retrieval, suggestions, and rule recalculation for one part family, without connecting to sensitive customer data or automatically quoting externally.
- 1Identify new drawing versions and features
- 2Retrieve historical similar parts and process prices
- 3Generate dual-option process labor hours
- 4Deterministic rules calculate prices
- 5Expert revision and approval
- 6Save discrepancies and evidence
Engineering Problems and Transferable Lessons
Key Engineering Insightcontrols- Special Issues
- Drawing similarity, process labor hours, and price are different problems.
- Why Ordinary Architecture Is Not Enough
- Changes in version, material, and process can make visual similarity lose cost comparability.
- Key technical choices
- AI recall suggestions, rule-based recalculation, expert confirmation.
- Costs and trade-offs
- Maintenance is heavier but recalculable.
- Failure conditions
- Zero error in historical prices may come from echoing or overfitting.
- Transferable experience
- Applicable to discrete manufacturing quotation and labor-hour estimation.
Public materials support the problem background; technical supplements are engineering inferences by this library. Related original text:
Original disclosureSource verifiedresultEngineering ProjectionNot yet executedinsightTechnical Architecture and Data Flow
Original text / solution listed separatelyOriginal architecture summary
The original discloses 1 business expert, 1 AI technical expert, and several AI digital employees; real data is involved throughout, using a deterministic engine, dual options, and human-in-the-loop. Drawing parsing, retrieval, and ERP/PLM interfaces are not disclosed.
Team, real data, deterministic engine, dual options, and HITL are project disclosures; parsing, retrieval, interfaces, permissions, and models are not public.
Suggested Architecture for Reproduction
The following is the research design and does not represent the complete implementation of the enterprise's internal system.
- 1Version identification
Verify drawing number, version, material, and effective date.
- 2Similar-part recall
Return candidates and rationale by combining drawings and structured attributes.
- 3Dual-option generation
Provide conservative reuse and explained adjustment options.
- 4Deterministic recalculation
Calculate candidate prices based on valid rates and rules.
- 5Expert confirmation
Record modifications item by item, and write back only after approval.
Suggested Data and System Interfaces
| Business Object | Join key / criteria | Suggested Sources | Purpose in the process |
|---|---|---|---|
| Part drawing version | part_id、drawing_revision、material | PLM/PDM or frozen samples | Ensure correct versions are cited. |
| Process route | part_id、route_version、operation_id | MES/process system | Compare process differences. |
| Labor hours and rates | operation_id、rate_version、valid_from | MES and ERP | Form suggestions and perform deterministic recalculation. |
Key design trade-offs
Research AnalysisAre similar parts based on image or manufacturing semantics?
Suggested choice:Combine visual/geometric with material, process, and key dimensions.
Basis for judgment: Visual similarity does not equal cost comparability.
Costs and boundaries: Governance and annotation costs are higher.
Can the model directly give the final price?
Suggested choice:Model suggests, rules calculate price, experts approve.
Basis for judgment: Amounts must be recalculable and bound to rate versions.
Costs and boundaries: Rule maintenance becomes an ongoing cost.
What does zero error in historical prices demonstrate?
Suggested choice:Only treat it as rule recalculation consistency; separately test new parts.
Basis for judgment: Reproducing known prices cannot prove generalization.
Costs and boundaries: Time-split blind testing is stricter.
Engineering Failure Conditions
Exceptions and Degradation
Stop quotation and supplement or manually select.
Hard filter and display reasons.
Prohibit recalculation and write-back.
Escalate to manual estimation from zero and review.
When it is suitable for adoption, and how value is measured
Research Recommendations by This Library- Data and Organizational Prerequisites
- Historical drawings with clear versions, processes, labor hours, and approved prices, where experts can explain discrepancies.
- Division of labor among AI, rules and humans
- AI extracts drawings, recalls similar parts, and suggests process times; a deterministic engine calculates prices; experts confirm and approve.
- Conditions not recommended for adoption
- Automatic quotation is unsuitable when drawings and prices cannot be aligned to part/version/process, or when key experience is not recorded.
- Investment and Ongoing Costs
- One-time data governance, rule explicitation, interfaces, and evaluation; ongoing maintenance of rates, feedback, and exception reviews.
- Value and evaluation criteria
- Measure cycle time, modification rate, recall, process labor-hour deviation, gross margin deviation, and return reasons.
- Suggested First Step
- Select one part family and freeze 100 to 300 historical versions; first validate similar-part Top-k, process explanation, and price recalculation.
Research Appendix Complete evidence, metric criteria and research materials
Original disclosure and evidence boundaries
Original text verifiedOriginal title: From "Delivering Software" to "Co-creating AI": Seeyon's FDE Brings Services to the Customer Frontline
Original summary: Chinese original · AI-organized. Tianfu Zhiyuan enters the site under the FDE staffing model, using 20,000 historical drawings to support new-part process, labor-hour prediction, and dual-option quotation; a deterministic engine adjudicates, and the business side progressively tests and accepts.
Quotations require finding similar parts among 20,000 historical drawings, and process labor hours depend on veteran workers.
Original location: Lines 553–556 ↗FDE staffing consists of 1 business expert, 1 AI technical expert, and several AI digital employees, with the customer's real data involved throughout and progressively accepted.
Original location: Lines 555–556 ↗The system uses deterministic engine adjudication, dual-option comparison, and human-in-the-loop.
Original location: Line 556 ↗Vendor claims approximately two weeks from data receipt to launch, with zero error in historical price reproduction.
Original location: Line 556 ↗Vendor self-report: approximately 20,000 drawings; approximately two weeks from data receipt to deployment and launch; zero error in reproducing historical prices in the library.
Disclosure BoundariesCustomer anonymous; zero error in historical prices in the library does not equal accuracy on new parts, profit margin, or production benefits. Sample splitting, versions, and independent acceptance are not disclosed.
Delivery process
Explicit FDEThe original explicitly states that Tianfu Zhiyuan enters on-site under the FDE staffing model: 1 role-specific business expert, 1 AI technical expert, and several AI digital employees; customer real data participates and is progressively accepted. Delivery method basis
Project disclosure 5 / 7 items. Vendor methods are labeled separately. Not disclosed means the current verification materials do not explain it.
- Delivery TeamProject disclosure
1 role-specific business expert, 1 AI technical expert, and several AI digital employees.
Original location: Lines 555–556- Customer participation and co-creationProject disclosure
Customer real data is involved throughout, with each step tested and accepted by the business side.
Original location: Line 556- Project durationProject disclosure
Vendor claims approximately two weeks from data receipt to deployment and launch.
Original location: Line 556- Data and System IntegrationProject disclosure
Uses approximately 20,000 historical drawings; specific PLM, MES, and ERP interfaces are not disclosed.
Original location: Lines 555–558- Iteration and operationsNot disclosed
Post-launch iteration and operations responsibilities are not explained.
- Acceptance and effectiveness evaluationProject disclosure
Business side progressively tests in practice; historical price reproduction shows zero error, with no public independent acceptance.
Original location: Line 556- Handover and Capability TransferNot disclosed
Training, asset handover, or exit criteria are not explained.
Delivery materials verification date: 2026-10-09
Metrics and Measurement Definitions
Retain original criteria"Source verified" only means the public disclosure can be located; it does not mean business results have undergone independent third-party acceptance. Unknown items remain "not disclosed in the original text."
Historical drawing scale
Adoption/deployment scaleApproximately 20,000 copies
Original disclosureSource verifiedproblem- Baseline
- Not disclosed in the original
- Comparison Period
- At project disclosure
- Measurement Scope
- Customer historical drawing library
- Limitations
- Version quality not disclosed.
From data receipt to deployment and launch
Results reported by the sourceApproximately 2 weeks weeks
Original disclosureSource verifiedresult- Baseline
- Not disclosed in the original
- Comparison Period
- Implementation phase
- Measurement Scope
- This project
- Limitations
- Does not equal the full project cycle.
Historical price reproduction
Benchmark/performance sampleZero error Vendor statement
Original disclosureSource verifiedresult- Baseline
- Not disclosed in the original
- Comparison Period
- Not disclosed in the original
- Measurement Scope
- Historical prices in the library
- Limitations
- Does not represent accuracy on new parts.
Research Verification Materials
Engineering Verification Status
Type, scope, and execution are recorded separatelyVerification has no automatic progression; passing limited synthetic samples does not prove the model, the complete system, or customer production acceptance. Public business outcomes are shown only according to the original evidence.
This section is an engineering reference design, and there is no end-to-end execution record in this library yet.
Test Plan · Not yet executed
- Verification scope
- Only reproduce retrieval, suggestions, and rule recalculation for one part family, without connecting to sensitive customer data or automatically quoting externally.
- Input Data
- Synthetic, public, or authorized data; specific experimental inputs are still to be prepared.
- Expected output
- Quotations can be traced to a unique version.;Time-split blind test report Top-k, process, and labor-hour deviation.;Zero writes for unapproved or expired versions.
- Actual output
- Not yet executed, no actual output
- Execution Time
- Not yet executed; collection time is not used as a substitute
- Limitations and failure notes
- Phased reproduction and evaluation are planned and cannot be used to prove that an actual system is already running.
Phased reproduction path
The complete solution has not yet been executedUse synthetic, public or authorized data. The following is a follow-up plan; if there is a rule check above, it only proves the samples it explicitly lists and does not mean complete reproduction has been completed.
- 1
Freeze part family
Align drawings, processes, labor hours, rates, and approved prices.
Planned deliverables:Desensitized dictionary, version mapping, and similar-part benchmark.
Suggested acceptance conditions:Quotations can be traced to a unique version.
- 2
Read-only dual options
Implement recall, two sets of candidates, and price recalculation.
Planned deliverables:Expert review interface and discrepancy records.
Suggested acceptance conditions:Time-split blind test report Top-k, process, and labor-hour deviation.
- 3
Controlled write-back
Only approved results invoke simulation or authorized interfaces.
Planned deliverables:Approval, version comparison, and idempotent receipts.
Suggested acceptance conditions:Zero writes for unapproved or expired versions.
Evaluation and Failure Handling
Proposed Solution to Be VerifiedThe evaluation targets are recommended thresholds and need to be adjusted based on risk and baseline; there are currently no measured results.
| Metrics | Measurement Method | Suggested Judgment Conditions |
|---|---|---|
| Similar parts Top-k | Experts annotate time-split samples and calculate Top-3/Top-5. | Thresholds determined based on manual baseline. |
| Process and labor-hour deviation | Compare suggested and later approved routes. | Zero tolerance for missing key processes. |
| Quotation and gross margin deviation | After freezing rates, compare candidates, approvals, and actual costs. | Zero currency, version, and order-of-magnitude errors. |
| Expert modifications and cycle time | Record modification reasons and preparation time. | Reduce retrieval and recalculation time without increasing return rate. |
Questions to confirm in the next round
- How many part families, users, and interfaces does the two-week launch cover?
- Does historical price reproduction exclude directly reading final prices?
- Drawing parsing, permissions, and data residency are not disclosed.
Verification Records and Items to Be Confirmed
2026-10-09Check FDE team, data scale, cycle time, HITL, and metric boundaries.
Official website readable; customer anonymous, no independent acceptance.
- FDE has project disclosure.
- Two weeks is not the full delivery cycle.
- Zero error is limited to historical price reproduction.
View all assertions · 5 items
Original disclosure · Source verified · web-31908e1debf9fab7bc272c7e:problem
Complete assertion: New-part quotation requires finding similar parts among approximately 20,000 drawings, and process labor hours depend on experience.
- Verification method
- Original materials verification
- Last Verified
- 2026-10-09
- Applicable boundaries
- Customer anonymous, part family not disclosed.
- Related cases
- A leading aviation industry enterprise: two-week launch of a drawing process labor-hour quotation system
Original disclosure · Source verified · web-31908e1debf9fab7bc272c7e:team
Complete assertion: 1 business expert, 1 AI expert, and several AI digital employees enter on-site under the FDE staffing model, with real data involved throughout.
- Verification method
- Original materials verification
- Last Verified
- 2026-10-09
- Applicable boundaries
- Vendor disclosure, no independent customer statement seen.
- Related cases
- A leading aviation industry enterprise: two-week launch of a drawing process labor-hour quotation system
Original disclosure · Source verified · web-31908e1debf9fab7bc272c7e:controls
Complete assertion: The system uses a deterministic engine, dual options, and human-in-the-loop.
- Verification method
- Original materials verification
- Last Verified
- 2026-10-09
- Applicable boundaries
- Implementation not disclosed.
- Related cases
- A leading aviation industry enterprise: two-week launch of a drawing process labor-hour quotation system
Original disclosure · Source verified · web-31908e1debf9fab7bc272c7e:result
Complete assertion: Vendor claims approximately two weeks from data receipt to launch, with zero error in historical price reproduction.
- Verification method
- Original materials verification
- Last Verified
- 2026-10-09
- Applicable boundaries
- Zero error is limited to historical prices, with no independent acceptance.
- Related cases
- A leading aviation industry enterprise: two-week launch of a drawing process labor-hour quotation system
Engineering Projection · Not yet executed · web-31908e1debf9fab7bc272c7e:insight
Complete assertion: Retrieval, process labor hours, price rules, and expert approval should be separated for evaluation.
- Verification method
- No experimental validation yet
- Last Verified
- Not yet verified or executed
- Applicable boundaries
- This library's judgment.
- Related cases
- A leading aviation industry enterprise: two-week launch of a drawing process labor-hour quotation system
Review record: web-31908e1debf9fab7bc272c7e:audit · Full-library review records
Original research judgment and attribution
Aviation quotation must convert drawing similarity and experience into an explainable chain of processes, labor hours, and deterministic prices, with experts progressively confirming.
Research compilation and solution analysis: Zuren Zhao · AI-assisted compilation. Original case delivery belongs to the original enterprises and service providers.